Blog

Postingan Terbaru

Electrical testing safety setup for high voltage field teams
2026-06-17Hongzhe Electrical Technical Content Team

Electrical Testing Safety Guide for Field Engineers

Electrical testing safety starts before the instrument is connected. Field teams should confirm the test plan, energized boundaries, PPE, barriers, lockout/tagout status, grounding, discharge steps, communication roles, and emergency response before any high-voltage or diagnostic work begins on site.

Electrical SafetyField TestingHigh Voltage
Power quality analyzer buying guide for electrical engineers
2026-06-17Hongzhe Electrical Technical Content Team

Power Quality Analyzer Buying Guide for Electrical Engineers

Power quality analyzer selection starts with the measurement problem, not the instrument catalog. Engineers should define harmonics, flicker, voltage events, phase count, accuracy class, logging duration, report format, site safety, calibration records, and software needs before asking suppliers for a quotation.

Power QualityElectrical TestingRFQ Guide
Cable fault location equipment selection guide
2026-06-16Hongzhe Electrical Technical Content Team

Underground Cable Fault Location - Methods and Equipment Selection Guide

Cable fault location is most accurate when engineers match the method to the fault type, cable length, access points, and site constraints. TDR, bridge, surge, and acoustic electromagnetic methods answer different parts of the same field problem and RFQ scope.

Cable TestingFault LocationHigh Voltage Testing
GIS substation maintenance tools for field teams
2026-06-16Hongzhe Electrical Technical Content Team

GIS Substation Maintenance - A Practical Checklist for Field Teams

GIS substation maintenance should combine gas handling, insulation checks, contact condition, mechanical inspection, and records. A checklist helps field teams plan outage work, select tools, avoid missed measurements, and create evidence that supports later reliability decisions and RFQ planning clearly.

GIS MaintenanceSF6 EquipmentContact Resistance
Partial discharge testing equipment for substation engineers
2026-06-16Hongzhe Electrical Technical Content Team

Partial Discharge Testing - A Field Guide for Power Engineers

Partial discharge testing helps engineers find localized insulation defects before they become failures. A useful field plan selects the right sensor method, controls noise, records calibration data, and interprets patterns against asset type, voltage class, operating history, and RFQ requirements.

Partial DischargeHigh Voltage TestingGIS Maintenance
Transformer oil testing equipment for dielectric diagnostics
2026-06-16Hongzhe Electrical Technical Content Team

Transformer Oil Testing - Key Methods and Equipment Buyers Need to Know

Transformer oil testing helps buyers separate routine insulation checks from deeper diagnostics. BDV, DGA, moisture, and acidity each answer a different question, so equipment selection should match asset voltage, lab workflow, sampling discipline, maintenance risk, reporting needs, and field reports.

Transformer TestingOil DiagnosticsBDV Testing
SF6 peralatan gas GIS daftar periksa untuk RFQ pemeliharaan
2026-05-19Hongzhe ElectricalTim Teknis

Cara Mempersiapkan sebuah SF6 Peralatan Gas RFQ

Peralatan gas SF6 yang jelas GIS harus menentukan jenis gas, RFQ merek, tugas layanan, detail konektor, dan persyaratan tujuan.

SF6RFQGISPemeliharaan
GIS daftar periksa sumber suku cadang untuk tim pemeliharaan
2026-05-19Hongzhe ElectricalTim Teknis

GIS Daftar Periksa Sumber Bagian

Sumber suku cadang GIS bekerja paling baik ketika pembeli menyediakan merek peralatan, lokasi suku cadang, foto, gambar, dan persyaratan layanan bersama.

GISBagianSumberPemeliharaan
Portabel SF6 pemilihan detektor kebocoran untuk GIS service
2026-05-19Hongzhe ElectricalTim Teknis

SF6 Catatan Pemilihan Detektor Kebocoran

SF6 pemilihan detektor kebocoran tergantung pada jenis gas, ekspektasi sensitivitas, alur kerja inspeksi, dan lingkungan pemeliharaan GIS.

SF6Detektor KebocoranSF6SnifferGIS
Data penggantian monitor kepadatan gas untuk GIS switchgear
2026-05-19Hongzhe ElectricalTim Teknis

Data Penggantian Monitor Kepadatan Gas Dibutuhkan

Penggantian monitor kepadatan gas GIS harus mencakup merek RFQ, foto panggilan, foto koneksi, rentang tekanan, dan pengaturan kontak alarm.

Monitor Kepadatan GasGISPenggantian
Kustom GIS katup sumber dari gambar dan sampel
2026-05-19Hongzhe ElectricalTim Teknis

Kustom GIS Katup dari Gambar dan Sampel

Sumber katup GIS membutuhkan gambar, sampel, atau dimensi yang tepat untuk mengkonfirmasi persyaratan benang, penyegelan, tekanan, dan material.

GISValveBagian KustomGambar
Pengujian transformator RFQ dasar-dasar untuk pembeli listrik
2026-05-19Hongzhe ElectricalTim Teknis

Pengujian Transformer RFQ Dasar-dasar

Pengujian transformator RFQ ss harus menjelaskan aset, kelas tegangan, tujuan pengujian, standar yang diperlukan, aksesori, dan lingkungan penggunaan.

Pengujian TransformerRFQKomisi
Input proyek pengukuran pelepasan parsial untuk RFQ
2026-05-19Hongzhe ElectricalTim Teknis

Input Proyek Pengukuran Pelepasan Sebagian

RFQ spengukuran PDs harus menyatakan tipe aset, kelas tegangan, metode kopling, lingkungan kebisingan, dan harapan pelaporan.

Pelepasan SebagianDelta TanIsolasi
Panduan pencocokan model komponen tegangan rendah
2026-05-19Hongzhe ElectricalTim Teknis

Panduan Pencocokan Model Komponen Tegangan Rendah

Sumber komponen tegangan rendah bekerja paling baik ketika pembeli memberikan nomor model, peringkat, detail paket, foto, dan alternatif yang dapat diterima.

Tegangan RendahKomponenPencocokan Model